PROJECT SCOPE
What this project requires
This is a maintenance project removing the existing chilled water piping and replacing it with new piping in the same locations in preparation for an expanded chilled water system throughout the building at later phase.
Trade opportunities
Trade signals are derived from municipal permit fields and project descriptions.
Location
12500 TECH RIDGE BLVDAustin, TX 78753District 1
Open map ↗