PROJECT SCOPE
What this project requires
ATT Proposes to co-locate Tower work includes antennas RRUs Surge suppressors fiber trunk cables. DC Power trunk cables. Ground wooden fence extension installation of concrete pad raised steel platform ice bridge equipment fire extinguisher cabinet 200a Meter and Breaker 1 20kW 48V DC Diesel Generator H-Frame with Batteries
Trade opportunities
Trade signals are derived from municipal permit fields and project descriptions.
Location
6912 1/2 E US 290 HWY SVRD WBAustin, TX 78752District 1
Open map ↗